Page:Scott's Last Expedition, Volume 2.djvu/550

This page needs to be proofread.
368
SCOTT'S LAST EXPEDITION
[April

flat on the boiler-room plates, and when the ship listed to starboard, stretch right down with his head below the plates and clear as much coal away from round the suction as possible. This often meant that the water surged back before he could get his head out, and there can be few nastier liquids to be ducked in than that very dirty bilge-water.

Meanwhile for the hand pumps Davies had to take off the bottom lengths of the suction pipes, lift them, and clear them from below. To do this the flange rivets had to be bored out, and it took eight hours' incessant work to finish the job.

During the re-fitting at Lyttelton pumps and everything connected with them were thoroughly overhauled in all respects and never gave serious trouble again.

Paterson Inlet was made on March 28 and Lyttelton on April 1.

Throughout all her cruise the scientific side of the ship's work was undertaken as follows: Lillie had all the biological work and Rennick was solely in charge of the soundings, and it can be safely said that neither of them missed a single opportunity that offered;
Meteorological Log: Drake;
Zoological Log: Bruce;
Magnetic Log and Current Log: Pennell;
while the officer of the watch, at the time, kept a genera lookout for anything of interest that might occur.

Lyttelton, April 1–July 10.The ship lay at Lyttelton for three months, undergoing a general and thorough refit. Rennick was employed the whole time in plotting as much of the surveying work carried out in the